
Education
Rossford High School
Mott Branch Library
The new Mott Branch Library, located right across the street from its current location, offers a welcoming space for the community to gather and connect. The 19,000 square-foot facility has an open concept design to make it feel like part …
Stroh Center – MBB Locker Room
Freshly renovated BGSU Mens Basketball Locker Room
Lakeside scope consisted of:
- Demo of existing architectural finishes
- Wall and soffit patching
- Acoustical Ceilings
- Painting
- Flooring
All work was completed (within 3 weeks) while the team was on Thanksgiving Break and a …
University Of Toledo Student Union
…
King Road Library
Work was performed in conjunction with The Spieker Company based on the architectural plans of The Buehrer Group. Scope of work included:
• Structural metal stud framing for the building shell
• Interior metal stud wall and ceiling framing
• …
Gym Floor and Artwork Project
Scope Of Project
Scope of work included gymnasium flooring and artwork.…
High School Rebuild Project
Scope Of Project
Unfortunately, sometimes natural disasters create some of our largest projects. Lakeside was pleased to provide labor and materials to help get the Lake High School and Community back to normality after the tornado demolished part of the …
School / Educational Facility Remodel
Scope Of Project
Scope of work included Framing; Drywall; Tape/Finish; and Acoustical Ceilings.
…