Skip to main content

The Toledo Zoo Aquarium

The Lakeside crew busted their “bass” to get The Toledo Zoo aquarium project completed within the tight timeline.

Furnish and install Epoxy Floor Coating System which consisted of one coat GP3579 and one coat 3746 with non-skid as well as a 4″ rubber base. Several samples were produced on site to achieve the customers’ desired goals.

Due to live animals in the area where the floors were treated, special attention was required to keep the animals protected. The specialized flooring team at Lakeside covered and protected adjacent surfaces, carefully contained dust, and installed the floors on a tight timeline.

Project Location:
Toledo, Ohio

Lakeside Project Manager:
Dave Stvartak / Scott Walterreit

Project Start and End Date:
1/11/2021 - 1/18/2021

Project Square Footage:
3,300

Project Description:
Renovation