Stroh Center – MBB Locker Room

Freshly renovated BGSU Mens Basketball Locker Room

Lakeside scope consisted of:

  • Demo of existing architectural finishes
  • Wall and soffit patching
  • Acoustical Ceilings
  • Painting
  • Flooring

All work was completed (within 3 weeks) while the team was on Thanksgiving Break and a road trip shortly thereafter.

RELATED SERVICES

FLOORING

ROUGH CARPENTRY

CEILINGS

FINISHED CARPENTRY