
Freshly renovated BGSU Mens Basketball Locker Room
Lakeside scope consisted of:
- Demo of existing architectural finishes
- Wall and soffit patching
- Acoustical Ceilings
- Painting
- Flooring
All work was completed (within 3 weeks) while the team was on Thanksgiving Break and a road trip shortly thereafter.