OUR TEAM IS READY TO HELP

Author: Mark

Calvary Church

Lakeside’s scope of work included metal framing, drywall, finish, acoustical ceilings, acoustical wall panels, and flooring to remodel the preschool area, family entrance corridor, and gym area.

Mott Branch Library

The new Mott Branch Library, located right across the street from its current location, offers a welcoming space for the community to gather and connect. The 19,000 square-foot facility has an open concept design to make it feel like part …

Lakeside Interior Contractors Celebrates 30 Years of Success

Lakeside Interior Contractors., Northwest Ohio’s leading commercial interior and exterior finish contractor, is proud to celebrate 30 years of business. Founded in 1989, Lakeside Interior Contractors has evolved, providing the area with a full range of services.

To recognize 30

Lakeside Interior Contractors Refreshes Brand

February 13, 2019, Perrysburg, Ohio: Lakeside Interior Contractors, Northwest Ohio’s leading commercial interior and exterior finish contractor, is excited to unveil a new brand. Founded in 1989, Lakeside has grown in size and reputation, and the new brand represents the

Stroh Center – MBB Locker Room

Freshly renovated BGSU Mens Basketball Locker Room

Lakeside scope consisted of:

  • Demo of existing architectural finishes
  • Wall and soffit patching
  • Acoustical Ceilings
  • Painting
  • Flooring

All work was completed (within 3 weeks) while the team was on Thanksgiving Break and a …

Hart Inc.

Hart Inc.

Work was performed in conjunction with Rudolph Libbe Inc. based on the architectural plans of The Collaborative.

The 20,000 square-foot office was built-out on floors five and six in the Hylant Building on Madison Avenue. The new space …

OSHA 4 Hour Updates

Thursday Feb. 8th at 4pm at the shop
Tuesday Feb. 20th at 4pm at the shop
Thursday Feb. 22nd 4pm at the shop

Please sign up with Bob Green and get the word out to the field employees.…