Skip to main content

King Road Library

Work was performed in conjunction with The Spieker Company based on the architectural plans of The Buehrer Group. Scope of work included:

  • Structural metal stud framing for the building shell
  • Interior metal stud wall and ceiling framing
  • Drywall
  • Suspended acoustical ceiling installation
  • Linear metal ceiling segments.